Final Drive Type P - Installation Instructions

FInal Drive Front Port Picture Final Drive Rear Port Picture

A – B Ports:

Located in the center of the flange these are the inlet and outlet ports. These will be the two larger diameter hoses. Transfer fittings from previous drive and complete connections.

C1 – C2 Ports:

The drain ports are located to the right and left of the A/B ports. The position of the drain port can be changed by placing a plug in either C1 or C2. It’s important to always attach the case drain hose to the uppermost port so any air can escape the case and leave the bottom port plugged. Transfer fitting from previous drive and complete connection.

D Port:

The two speed port is located on the right side of the flange and the fitting comes preinstalled. Identify two speed hose and complete connection.

Short on Time? We’ll Find Your Parts

With our deep industry knowledge and our extensive access to tools and resources, our H&R parts specialists can simplify your search and ensure you get the best part at the best price, quickly and simply.

Give Us A CallFill Out Our Form

questions? Call us at 1-800-333-0650